Emergency Shutdown System

When well-completion operations are conducted on a platform where there are other hydrocarbon-producing wells or other hydrocarbon flow, an emergency shutdown system (ESD) manually controlled station should be installed near the driller's console or well-servicing unit operator's work station.

offshore rig on fire
Emergency shutdown is critical.

When well-work over operations are conducted on a well with the tree removed, an emergency shutdown system (ESD) manually controlled station should be installed near the driller's console or well-servicing unit operator's work station, except when there is no other hydrocarbon-producing well or other hydrocarbon flow on the platform.

Knowledge Check Choose the best answer for the question.

5-2. When well-completion operations are conducted on a platform where should an emergency shutdown system (ESD) station be installed?