17-3. Personnel Required Qualification/Training.
Demolition and Renovation Activities
- Ensure all employees involved in demolition or renovation are well-informed about the Demolition Plan for safe work conduct.
Load Handling Equipment (LHE) Operators
- LHE Operators must receive proper training and qualification as specified in chapter 16.
Lead Inspectors
- Lead inspectors responsible for conducting surveys must fulfill the training requirements outlined in paragraph 6-3.
Asbestos Inspectors
- Asbestos inspectors conducting surveys are required to meet the training standards specified in paragraph 6-3.
17-4. Roles and Responsibilities.
De-energizing Electrical Components and Service Lines
- The facility owner must identify, verify, and confirm in writing the de-energization of electrical components and service lines to the USACE supervisor/KO or COR and workers before work commencement.
- Provide engineering drawings indicating the location and control means of all service lines to the USACE supervisor/KO or COR.
- Ensure de-energized electrical services are secured using a Lockout/Tagout (LOTO) method and confirm this via field verification as per chapter 12.
Fire Suppression Systems
- The owner must provide written confirmation to the USACE supervisor/KO or COR of the de-activation and chemical removal from the Chemical Fire Suppression (CFS) system before starting renovation or demolition.
- If the CFS system is active after demolition begins, immediately stop work and inform the USACE supervisor/KO or COR.
- Do not abate or remove the CFS system or its components without approval from the USACE supervisor or acceptance by KO or COR.
Knowledge Check Choose the best answer for the question.
17-2. Prior to demolition, renovation, and re-occupancy, who must identify, verify, and confirm in writing the de-energization of electrical components and service lines?