8-7. Minimum Plan Requirements.
Traffic Control Plan Requirements
- Must be developed by someone knowledgeable in temporary traffic control as per MUTCD and state DOT requirements.
- Needs to be prepared before work starts.
- Should include a detailed description of the activity, anticipated hazards, and control measures.
Personnel and Responsibilities
- Outline roles, responsibilities, and qualifications of personnel.
- Detail the plan for maintaining traffic and access, minimizing obstruction.
- Include coordination with adjacent projects and external agencies.
Signage and Traffic Control
- Specify proposed signage placement and traffic control measures.
- Indicate the number of flag/signal persons for traffic control within the work area.
- List minimum PPE requirements for all site personnel.
Coordination and Compliance
- Detail procedures for road closure coordination with local authorities.
- Describe inspection and oversight methods to ensure plan adherence.
Knowledge Check Choose the best answer for the question.
8-5. Traffic control requirements must be developed by someone knowledgeable in _____.
You forgot to answer the question!