We're sorry, but OSHAcademy doesn't work properly without JavaScript enabled. Please turn on JavaScript or install a browser that supports Javascript.

511 EM 385-1-1 Chapters 9-15
Skip to main content

10-8. General Requirements.

General Requirements

  • Welding and cutting equipment must meet ANSI Z49.1 standards.
  • Vents or openings must be provided before heating drums or containers to release built-up pressure.
  • Keep cables, hoses, and equipment clear of passageways and stairs.

Electrical and Pressurized System Requirements

  • Maintain and use welding cylinders as per specific guidelines.

Personal Protective Measures

  • Provide eye and face protection against UV, infrared radiation, and flying objects during welding and related operations.
  • Vent welding, cutting, and heating operations to prevent hazardous exposures.
  • Protect others in the same atmosphere as welders or cutters.

Fire Protection

  • Ensure suitable fire extinguishing equipment is available and ready for immediate use near welding or cutting operations.
  • Hot work permits are required for hot work operations on federal installations, unless specified otherwise.
  • Survey the area to ensure it is free of combustible materials, potentially explosive atmospheres, or oxygen-enriched atmospheres before starting operations.

Knowledge Check Choose the best answer for the question.

10-6. What must be provided before heating drums or containers?

10-8. General Requirements. (a.–d.).