We're sorry, but OSHAcademy doesn't work properly without JavaScript enabled. Please turn on JavaScript or install a browser that supports Javascript.

815 Demolition Safety
Skip to main content

Eliminating Hazardous Substances

After conducting surveys and assessments to identify and characterize hazardous substances present on-site, it's important to develop and implement proper abatement or remediation plans specific to each substance.

Drum barrels that must be eliminated prior to demolition.
Eliminate or mitigate hazardous substances prior to demolition.

To eliminate the hazardous substances that have been identified prior to and during demolition, do the following:

  • Purge lines, tanks, and equipment containing hazardous chemicals, gases, or flammable materials.
  • Use air monitoring equipment such as a combustible gas indicator, toxic gas monitor, or oxygen monitor to determine if any hazardous conditions remain.
  • When necessary, provide additional controls to protect response and recovery workers (e.g., forced ventilation, respiratory protection, etc.).

Knowledge Check Choose the best answer for the question.

3-8. What should you do to eliminate hazardous substances?