Change Analysis

Anytime you bring something new into your worksite, whether it is a piece of equipment, different materials, a new process, or an entirely new building, you unintentionally may introduce new hazards.

If you are considering a change for your worksite, you should analyze it thoroughly beforehand.

Change analysis is cost-effective in terms of the human suffering and financial loss it prevents. Moreover, heading off a problem before it develops usually is less expensive than attempting to fix it after the fact.

An important step in preparing for a worksite change is considering the potential effect on your employees. Individuals respond differently to change, and even a clearly beneficial change can throw a worker temporarily off-balance -- literally as well as figuratively -- and increase the risk of accidents. You will want to inform all affected employees of the change, provide training as needed, and pay attention to worker response until everyone has adapted.

Building or Leasing a New Facility

Even something as basic as a new facility needs to be reviewed carefully to identify hazards it might pose. A design that seems to enhance production of your product and appears delightful to the architect may be a harmful or even fatal management decision. Have safety and health experts take a careful look beforehand at all the design/building plans.

Installing New Equipment

An equipment manufacturer does not know how its product will be used at your worksite. Therefore, you cannot rely totally on the manufacturer to have completely analyzed and prepared controls or safe procedures for the product. Moreover, if the equipment is produced in a foreign country, it may not meet clear requirements of U.S. standards and laws. Therefore, involve health and safety professionals in the purchase decision and in the installation plans.

Knowledge Check Choose the best answer for the question.

4-5. What type of analysis would you conduct when you change a process or get new equipment or materials?