27-8. General Requirements.
Roofing Instructions
- A Qualified Person (QP) must perform a structural analysis of the roof to ensure the load capacity is not exceeded before starting work.
- Halt roofing activities promptly during severe weather conditions like strong winds or heavy rain.
- Ensure materials and equipment for roofs over 16 feet high are supplied via hoisting devices, stairways, or progressive platforms.
Wood Construction Guidelines
- All wood used must comply with building codes and design criteria, with inspections for compliance, especially for temporary platforms or fall protection systems.
- Implement temporary restraints, like cleats or straps, before manually raising framed walls 10 feet or higher, and avoid relying solely on anchor bolts for blocking or bracing.
- Ensure employees don't work or walk on structural members like top plates or joists until they're securely braced and supported.
27-9. Figures and Tables.
Not Applicable.
27-10. Checklists and Forms.
Not Applicable.
Knowledge Check Choose the best answer for the question.
27-8. When should materials and equipment for roofs be supplied via hoisting devices, stairways, or progressive platforms?