29-7. Minimum Plan Requirements.
Explosives Site Safety Plan (ESSP)
- The ESSP must be created in compliance with ANSI/ASSP A10.7 and relevant federal and state regulations before storing or starting operations with explosives.
- For military installations, the ESSP requires approval from the DoD Explosives Safety Board.
Master Blasting Plan
- Develop the Master Blasting Plan before placing explosives onsite or beginning any related operations.
- Submit the plan for approval to the USACE supervisor, the KO, or the COR, as per the direction of the blasting SME.
- Ensure the plan includes personnel details, contractor requirements, training programs, types of explosives, and operational procedures as specified in paragraph 29-3.
Vibration Monitoring Plan
- Formulate a written plan for monitoring vibrations and air blast before starting controlled blasting operations.
- Submit the plan for approval or acceptance to the USACE supervisor, the KO, or the COR.
- Include details about structures for pre-blast surveys, monitoring locations, instrumentation types, and example reports in the plan.
Knowledge Check Choose the best answer for the question.
29-5. What should be developed before placing explosives onsite or beginning any related operations?
You forgot to answer the question!